Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: LEAKAGE DEFINITIONS FOR OPERATOR'S PMCS
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-5430-232-12&P CAUTION Equipment  operation  Is  allowable  with  minor  leakages  (Class  I  or  II).    Of  course, consideration  must  be  given  to  fluid  capacity  in  the  item/system  being  checked inspected.  When In doubt, nothing your supervisor.  When operating with Class I or  II  leaks,  continue  to  check  fluid  levels  as  required  In  your  PMCS.    Class  IH1 leaks should be reported immediately to your supervisor. a.  CLASS I-Seepage of fluid (as Indicated by wetness or discoloration) not great enough to form drops. b.  CLASS II-Leakage of fluid great enough to form drops but not enough to cause drops to drip from Item being checked/inspected. c.    CLASS  III-Leakage  of  fluid  great  enough  to  form  drops  that  fall  from  being checked/inspected. 2-4

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business