Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 2-12. Ground Rod Installation.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-4930-247-13&P 2-.10.  ASSEMBLY AND PREPARATION FOR USE - cont. Figure 2-12.  Ground Rod Installation. 2-11.  INITIAL ADJUSTMENT. a. Hoses, Couplings and Nozzles. (1) Verify that all connections are secure. (2) Verify that valved dry break couplings are positioned with control arms facing up. (3) Verify that caps and plugs are installed on all open components. (4) Inspect fuel hoses for kinks, twists and tight bends.  Straighten hoses as required. b. CCR Nozzles.  Perform initial adjustments in accordance with TM10-4930-248-13&P. c. HEMTT Tanker.  Perform initial adjustments in accordance with TM9-2320-279-10-1. 2-32

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business