| |
TM 10-4930-247-13&P
2-.10. ASSEMBLY AND PREPARATION FOR USE - cont.
Figure 2-12. Ground Rod Installation.
2-11. INITIAL ADJUSTMENT.
a.
Hoses, Couplings and Nozzles.
(1)
Verify that all connections are secure.
(2)
Verify that valved dry break couplings are positioned with control arms facing up.
(3)
Verify that caps and plugs are installed on all open components.
(4)
Inspect fuel hoses for kinks, twists and tight bends. Straighten hoses as required.
b.
CCR Nozzles. Perform initial adjustments in accordance with TM10-4930-248-13&P.
c.
HEMTT Tanker. Perform initial adjustments in accordance with TM9-2320-279-10-1.
2-32
|