| |
Section II. MAINTENANCE ALLOCATION CHART
(4)
MAINTENANCE LEVEL
(1)
GROUP
NUMBER
(2)
COMPONENT/ASSEMBLY
(3)
MAINTENANCE
FUNCTION
UNIT
DS
GS
DEPOT
(5)
TOOLS &
EQUIP
(6)
REMARKS
C
O
F
H
D
TM 10-4930-247-13&P
00
HEMTT
TANKER
AIRCRAFT
REFUELING
SYSTEM
01
Closed Circuit
A
Refueling
(CCR) Nozzles
02
Single Point
Inspect
0.1
Refueling
Replace
0.2
Nozzle
Test
0.5
1, 2, 3, 5
(Type D1)
Repair
1.5
3.5
0201
Non-Valved
Inspect
0.1
Dry Break
Replace
0.5
Coupling
Repair
1.0
1
03
Recirculation
Inspect
0.1
Nozzle
Replace
0.2
Assembly
Test
0.5
1, 2, 3, 5
Repair
1.5
3.5
04
DELETED
05
Hose
Inspect
0.1
Assembly,
Replace
0.2
2 in. x 50 ft.
Repair
1.0
1, 2, 4
0501
Valved Dry
Inspect
0.1
Break
Replace
0.5
Coupling
Repair
1.0
1
06
Elbow
Inspect
0.1
Assembly
Replace
0.2
Repair
0.5
1, 2
0601
Non-Valved
Inspect
0.1
Dry Break
Replace
0.5
Coupling
Repair
1.0
1
07
Tee Assembly
Inspect
0.1
Replace
0.2
Repair
0.5
1,2
B-4 Change 6
|