Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Testing.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-4930-247-13&P 5-3.  RECIRCULATION NOZZLE ASSEMBLY REPAIR - cont. f. Testing. NOTE The  D1  Nozzle  must  be  fully  assembled  to  perform  both  functional  and  leakage tests.  Refer to para 4-13 to assemble components of the nozzle. (1) Functional Test.  Refer to figure 5-8. NOTE The flat portion of lever should be beneath the flat portion of ramp on nozzle collar. This is the closed position and the handle should not turn. (a) Attempt to move lever (1) to the OPEN position.  Lever must not move to OPEN position. (b) Connect nozzle (2) to test adapter (3) (para 2-12b). (c) Rotate lever (1) to the OPEN position until it passes over center and stops against the internal stop. (d) Grab handles (4) and attempt to remove nozzle (2 from adapter 33).  Nozzle should not disconnect. (e) Position lever (1) to CLOSE, then OPEN position.  Repeat a minimum  of  five  times.    Lever  should  be not bind or require excessive force to operate and must lock over center in the CLOSED position. (f) Position lever (1) to CLOSED position, and disconnect nozzle (2) from adapter 13) (para 2-12b). 5-20