| |
TM 10-4930-247-13&P
CHAPTER 5
DIRECT SUPPORT MAINTENANCE INSTRUCTIONS
Paragraph
Title
Page
Direct Support Maintenance Procedures ......................................................................
5-1
5-1.
Introduction ....................................................................................................................
5-1
5-2.
Single Point Refueling Nozzle Assembly (D1) Repair ........................................................
5-1
5-3.
Recirculation Nozzle Repair .............................................................................................
5-12
DIRECT SUPPORT MAINTENANCE PROCEDURES
5-1.
INTRODUCTION.
This Chapter contains instructions for performing Direct Support level maintenance on components of the HEMTT Tanker
Aircraft Refueling System (HTARS).
5-2.
SINGLE POINT REFUELING NOZZLE ASSEMBLY (D1) REPAIR.
This task consists of:
a. Disassembly
b. Cleaning
c. Inspection
d. Repair
e. Assembly
f. Testing
INITIAL SET-UP:
Tools:
Wiping Rag (Item 2, App F)
General Mechanics Tool Kit (App B, Sect III, Item 1)
Silicone Compound (Item 3, App F)
Shop Equip., Electrical Repair (App B, Sect III, Item 5)
Anti-seize Tape (Item 5, App F)
Adapter (App B, Sect III, Item 3)
Repair Kit (Item 22, App J)
Equipment Condition:
Cotter Pin (Item 23, App J)
Handles and inlet elbow removed (para 4-13)
(Model HTARS101) Petrolatum (Item 6, App F)
Personnel Required:
(Model HTARS101) Sealing Compound
(Model HTARS101) Two
(7, App F)
Material/Parts:
(Model HTARS101) Seal Kit (tem 24, App J)
Cleaning Solvent (Item 1, App F)
(Model HTARS101) Parts Kit (tem 25, App J)
(Model HTARS101) Parts Kit (tem 26, App J)
NOTE
Ensure that all parts identified as mandatory replacement parts are discarded and
replaced with new components.
Change 4 5-1
|