| |
TM 10-4930-243-13&P
Section V. PREPARATION FOR STORAGE OR SHIPMENT
4-12. SECURITY PROCEDURES.
Refer to AR 190-11 or AR 190-13.
4-13. PREPARATION FOR MOVEMENT.
NOTE
For disposal of contaminated fuel, refer to FM 10-20, Organizational Maintenance of Military
Petroleum Pipelines, Tanks and Related Equipment
a.
Drain residual fuel from CCR Nozzle and GFA.
b.
CCR Nozzle.
(1)
Install cover on CCR Nozzle outlet
(2)
Install plug in coupling assembly.
c.
GFA.
(1)
If connected to CCR Nozzle, pull CCR Nozzle collar back and disconnect GFA.
(2)
Install cap and plug on GFA .
d.
The CCR Nozzle and GFA are now ready to be placed in a suitable container. For additional information on
Packaging of Army Material for Shipment and Storage, refer to AR 746-1.
4-14. ADMINISTRATIVE STORAGE.
Placement of equipment in administrative storage should be for short periods of time when a shortage of maintenance
effort exists. Items should be in mission readiness within 24 hours or within the time factors as determined by the
directing authority. During the storage period, appropriate maintenance records will be kept.
Before placing the equipment in administrative storage, current preventive maintenance checks and services should be
completed, shortcomings and deficiencies should be corrected, and all Modification Work Orders (MWO) should be
applied.
Storage site selection. Inside storage is preferred for items selected for administrative storage. If inside storage is not
available, trucks, vans, conex containers, and other containers may be used.
4-16
|