| |
TM 10-4930-242-13&P
5-2.
D-1 FUELING NOZZLE REPAIR - continued.
NOTE
Bumper collar must be warmed to soften before installing onto nozzle
collar.
(38)
Install bumper collar (12) onto nozzle collar (14) using a soft head hammer.
(39)
Slide the looped end of dust cover (10) over one of the handles on collar (14).
(40)
Mount one grip (9) over the handle on collar (14) and secure the grip and dust cover (10) with one retaining
ring (11).
(41)
Mount the remaining grip (9) on collar (14) and secure with the second retaining ring (11).
(42)
Place the dust cover (10) over bumper collar (12).
5-18
|