TM 104930-241-13
12-16. ASSEMBLY AND PREPARATION FOR USE - CONT.
f.
Fuel System Primary 600 GPM Pump Input. Refer to figure 2-14.
CAUTION
To prevent contamination of fuel system components, keep dirt, ice and snow from entering open couplings during
assembly.
NOTES
This manual covers installation of a typical AFSSP system. You may need to adjust the number of components
used, and their position in the system, to meet your mission requirements. Additional hoses, couplings, adapters and
elbows are supplied with the AFSSP as accessories.
If required two 6-inch elbows may be used at the input of primary pump.
Refer to para 2-16e for connection of quick disconnect couplings.
(1)
Connect together seven 10 foot 6-inch noncollapsible hoses (1).
(2)
Connect 6-inch valve section (2) to one end of noncollapsible hoses (1).
(3)
Connect wye assembly (6 in. M x 6 in. F x 6 in. F) (3) to other end of noncollapsible hoses (1).
(4)
Connect together three 10 foot 6-inch noncollapsible hoses (4).
(5)
Connect one end of 6-inch noncollapsible hoses (4) to wye assembly (3).
(6)
Connect 6-inch valve section (5) to other end of noncollapsible hoses (4).
(7)
Connect together four 10 foot 6-inch noncollapsible hoses (6).
(8)
Connect one end of 6-inch noncollapsible hoses (6) to wye assembly (3).
(9)
Connect other end of noncollapsible hoses (6) to input of primary 600 GPM pump (7).
2-39
|