| |
TM 10-4930-240-13
2-20. PREPARATION FOR MOVEMENT-cont.
j.
Packing.
(1) Prepare the filter separator for movement. Refer to TM 10-4330-236-13.
(2) Prepare the 200 GPM pump for movement. Refer to TM 104320-342-10.
(3) Prepare the 500 gallon collapsible drums for movement. Refer to TM 10-8110-203-12&P.
(4) Pack nozzles, wyes and couplings in component carriers.
(5) Roll 2-inch discharge hoses and pack in hose carriers.
(6) Bundle remaining suction hoses. Secure hoses together with straps.
2-70
|