Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Section III OPERATION UNDER USUAL CONDITIONS
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-4930-240-13 Section III  OPERATION UNDER USUAL CONDITIONS 12-15.  ASSEMBLY AND PREPARATION FOR USE. NOTE Two persons are required to assemble the AFARE safely. a  Site Selection.  Select a firm, level installation area large enough to contain all system components. Melting  and  refreezing  soil,  ice  and  blowing  snow  present  special  hazards  that  must  be  anticipated before  setting  up  the  equipment.    The  site  must  provide  access  to  the  fuel  system  for  resupply  by trucks and aircraft and provide adequate clearance for approaching aircraft at the refueling points. For additional information on selecting a site for the AFARE, refer to FM 10-69. After selecting the installation area, position all AFARE equipment near the site. b  Unpacking. (1)  Remove AFARE components from the transport vehicle. (2)  To aid assembly, separate components into groups of similar parts during removal.  For example, group all the fuel hoses together, then all the tees, elbows and nozzles. (3)  Unpack 500 gallon collapsible drums.  Refer to TM 10-8110-203-12P. (4)  Unpack the 200 GPM pump.  Refer to TM 10-4320-342-10. (5)  Unpack the filter separator.  Refer to TM 10-4330-236-13. c.  Position Components. (1)    Using  rough  terrain  forklift  or  suitable  equipment,  position  fuel  drums,  fueling  manifold,  filter separator, 200 GPM pump and pressure reducing skid within the installation site. (2)  Position deflector storage box next to 200 GPM pump. (3)  Position bundled 3-inch suction hoses next to 500 gallon drums. (4)  Assemble and prepare 500 collapsible drums for use Refer to TM 10-8110-203-12. (5)  Assemble and prepare 200 GPM pump for use.  Refer to TM 104320-342-10. ( 6)  Assemble and prepare filter separator for use.  Refer TM 10-4330-236-13. 2-35