| |
TM 10-4930-240-13
4-35. ADAPTER ASSEMBLY REPAIR.
This task covers:
a.
Disassembly
b.
Cleaning
c.
Repair
d.
Assembly
INITIAL SETUP:
Tools:
Material/Parts:
General Mech Tool Kit
(App B, Sect III, Item 1)
Cleaning Solvent
(Item 1, App E)
Vise
(App B, Sect III, Item 2)
Wiping Rag
(Item 2, App E)
Pipe Wrench (2 ea)
(App B, Sect III, Item 5)
Thread Sealant
(Item 4, App E)
Equipment Condition:
Coupling Gasket
(Item 4, App J)
Adapter assembly removed (para 4-13a)
CAUTIONS
· To prevent premature failure of adapter assembly, gaskets certified for arctic
service must be installed. If a new dust cap or female coupling has been
Installed, remove and discard black gaskets supplied with the new components
and replace them with arctic service gaskets.
· Ensure gasket is fully seated in gasket seat of coupling/dust cap to prevent leaks
in assembled components.
NOTES
· Ensure that all parts identified as mandatory replacement parts are discarded
and replaced with new components.
· The following instructions are typical for all adapters supplied with the AFARE.
A Male X Male adapter is shown. Repair of other adapters is similar.
a. Disassembly. Refer to figure 4-23.
(1) Place adapter assembly (1) in vise.
(2) Remove three split rings (2, 3, and 4) and chains (5 and 6).
(3) Remove dust cap (7) from male coupling half (8).
(4) Remove gasket (9) from dust cap (7).
(5) Remove dust cap (10) from male coupling half (11).
(6) Remove gasket (12) from dust cap (10).
(7) Remove male coupling half (11) from male coupling half (8).
4-68
|