4-30. FUELING MANIFOLD ASSEMBLY REPAIR.
This task covers:
a.
Removal
b.
Disassembly
c.
Cleaning
d.
Repair
e.
Assembly
f.
Installation
INITIAL SETUP:
Tools:
Material/Parts:
General Mech Tool Kit (App B, Sect III, Item 1)
Cleaning Solvent
(Item 1, App E)
Vise
(App B, Sect III, Item 2)
Wiping Rag
(Item 2, App E)
Pipe Wrench (2 ea)
(App B, Sect III, Item 5)
Thread Sealant
(Item 4, App E)
Equipment Condition:
Foam (A/R)
(Item 14, App J)
Cover removed (para 2-20)
Foam (A/R)
(Item 15, App J)
Personnel Required:
Lockwasher (16)
(Item 16, App J)
two
Coupling Gasket
(Item 1, App J)
Coupling Gasket
(Item 4, App J)
NOTE
Ensure that all parts identified as mandatory replacement parts are discarded and
replaced with new components.
a. Removal. Refer to figure 4-18.
(1) Remove two nuts (1), lockwashers (2), flat washers (3) cap screws (4) and flat washers (5).
(2) Remove strap (6) from fueling manifold assembly (8).
(3) Remove foam (7) from strap (6).
(4) Repeat steps (1) through (3) for other strap (6).
(5) Using two personnel, remove fueling manifold assembly (8) from skid (16).
(6) Remove two nuts (10), lockwashers (11), flat washers (12), cap screws (13) and flat washer (14).
(7) Separate bracket (15) from skid (16).
(8) Remove foam (9) from bracket (15).
(9) Repeat steps (6), (7) and (8) for remaining bracket (15).
4-53
|