h. Install a maximum of three 4.00" x 10' hose assemblies (11) to the suction port of pump assembly (10) and to tee
assembly (12).
i. Install wye and tee assembly (13) onto tee assembly (12).
j. Place each of three valve assemblies (14) into position which will allow enough space for fuel tanker trucks to
maneuver and dispense fuel.
k. Install 4.00" x 10' hose assemblies (15) (quantity as needed) between wye and tee assembly (13) and three valve
assemblies (14).
l. Install tee assembly (16) and valve assembly (17) to hose assembly (4).
m. Install a maximum of eight 4.00" x 1O' hose assemblies (18) to valve (17) and to suction port of pump assembly
(19).
n. Connect two 4.00" x 50' hose assemblies (20) to discharge port of pump assembly (19).
o. Install wye assembly (21), two valve assemblies (22), and two 4.00" x 25' hose assemblies (23) to filter/separators
(24) and (25).
p. Install two 4.00" x 25' hose assemblies (26) to filter/separators (24) and (25).
q. Install two valve assemblies (27) and wye assembly (28) to hose assemblies (26).
r. Install water detection adapter assembly (29), reducer (30), meter assembly (31), reducer (32), and valve assembly
(33).
s. Install three tee assemblies (34), three 4.00" x 50' long discharge hoses (35), and three 4.00" x 25' long discharge
hoses (36).
t. Install three valve assemblies (37), three 4.00" x 25' long discharge hose assemblies (38), and three quick acting
valve assemblies (39).
u. Install tee assembly (40), valve assembly (41), and ten 4.00" x 10' long suction hoses (42).
v. Install valve assembly (43), 3.00" x 50' long discharge hose (44), tee assembly (45), 2.00" x 25' long discharge
hose (46), and quick acting valve (47).
w. Install two 3.00" x 50' long discharge hoses (48), two 3.00" x 25' long discharge hoses (49), four tee assemblies
(50), four 1.50" x 25' long discharge hoses (51), quick acting valve assembly (52), and three nozzles (53).
x. Install ground rods into position throughout the FSSP in accordance with FM 10-69.