Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Section III. OPERATION UNDER USUAL CONDITIONS
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM10-4930-239- 12&P Section III.  OPERATION UNDER USUAL CONDITIONS 2-6.  ASSEMBLY AND PREPARATION FOR USE.  Figure 2-1 shows a typical layout of the FSSP.  It should be used only as a guide since terrain features of the site and the specific application will dictate the final configuration.  Plan the most efficient  layout  for  the  selected  site,  making  the  best  use  of  natural  cover  and  level  terrain.    Plan  for  good  access  for vehicles loading and unloading fuel. NOTE     Make sure all dust caps and plugs remain in place on components, hoses, and fittings until they are connected into the system.     For  all  components  having  cam  lock  type  caps  and  plugs,  attach  protective plugs   from   one   component   into   the   protective   caps   of   the   other   mating component to protect loose caps, plugs, and gaskets when components are in use. a.  Position major components of the FSSP first (1)   Place   the   selected   combination   of   three   3,000,   10,000,   and   20,000   gallon   collapsible   fuel   tanks   (1)   in accordance with instructions contained in the fuel tank operator manual. (2)  Place  the  two  350  GPM  pump  assemblies  (10)  and  (19)  as  shown  in  Figure  2-1  and  in  accordance  with instructions contained in the applicable operator's manual for the pump assemblies. (3)  Place  the  350  GPM  filter/separator  units  (24)  and  (25)  as  shown  in  Figure  2-1  and  in  accordance  with instructions contained in the applicable operator's manual for the filter/separator units. b.  Install two 4.00" x 10' hoses (2) onto fuel tank (1) and manifold assembly (3). c.  Install a maximum of six 4.00" x 10' hoses (4) (when using 20,000 gallon tanks) or a minimum of two 4.00" x 10' hoses (4) (when using 3,000 gallon tanks) to manifold assemblies (3). d.  Repeat steps a.  and b.  for other fuel tanks. e.  Install three 4.00" x 10' hoses (5) between manifold assemblies (3) and valve assembly (6).  Repeat for other two tanks (1). f.  Install a maximum of six 4.00" x 10' hoses (7) (when using 20,000 gallon tanks) or a minimum of two 4.00" x 10' hoses (7) (when using 3,000 gallon tanks) between three valve assemblies (6). g.  Install valve assembly (8) and two 4.00" x 10' hose assemblies (9) to valve assembly (6) and to discharge port of pump assembly (10). 2-6

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business