| |
TM 10-4930-238-12&P
4-15. TEE ASSEMBLY - Continued.
f. Reassembly.
(1)
Refer to Figure 4-11 and apply sealing compound to threads and install two coupling halves (6)
in tee (7).
(2)
Install two gaskets (5) and two dust plugs (4). Secure dust plugs with camlock levers.
(3) Apply sealing compound to threads and install coupling half (3), gasket (2), and dust cap (1).
Secure dust cap with camlock levers.
g.
Installation.
(1)
Refer to Figure 4-10 and position tee assembly (2) in place on butterfly valve (3) and secure with
camlock levers.
(2)
Install two suction hose assemblies (1) and secure with camlock levers.
4-16. VALVE, ELBOW COUPLER.
This task consists of:
a. Removal
b. Cleaning
c. Inspection
d. Repair
e. Disassembly
f. Reassembly
g. Installation
INITIAL SETUP:
Tools Requ ired:
Tool Kit, General Mechanics, Appendix B , Item 3
Materials Required:
Cleaning Solvent (Item 1, Appendix E)
Cloth, Lint-Free (Item 3, Appendix E)
Gaskets, P/N 6338M
Packing, P/N H234M
Equipment Co nditions:
Forward Area Refueling Equipment shutdown per para. 2-8 b.
General Safety Instructions:
Do not smoke or use an open flame in vicinity of the Forward Area Refueling
Equipment. Failure to comply may result in personnel injury.
420
|