| |
TM 10-4930-238-12&P
1-4.
PREPARATION FOR STORAGE OR SHIPMENT- Continued.
a.
Placement of equipment in administrative storage should be for short periods of time when a shortage
of maintenance effort exists. Items should be in mission readiness within 24 hours or within the time factors as
determined by the directing authority. During the storage period appropriate maintenance records will be kept.
b.
Before placing equipment in administrative storage, current preventive maintenance checks and ser-
vices should be completed, shortcomings and deficiencies should be corrected, and all modification work orders
(MWOS) should be applied.
c.
Storage site selection. Inside storage is preferred for items selected for administrative storage. If inside
storage is not available, trucks, vans, conex containers and other containers may be used.
1-5.
QUALITY ASSURANCE/QUALITY CONTROL (QA/QC).
Quality Assurance/Quality Control procedures will be those enforced by the local commander.
1-6.
NOMENCLATURE CROSS REFERENCE LIST.
Co mmon Name
Official Nomenclature
Forward Area Refueling Equipment
Forward Area Refueling Equipment
or FARE
1-7.
REPORTING EQUIPMENT IMPROVEMENT RECOMMENDATIONS (EIRs).
If the Forward Area Refueling Equipment needs improvement, let us know. Send us an EIR. You, the user, are
the only one who can tell us what you do not like about your equipment. Let us know why you dont like the design.
Put it on an SF 368 (Quality Deficiency Report). Mail it to us at Commander, U. S. Army Aviation and Troop Comm-
and, ATTN: AMSAT-I-MDO, 4300 Goodfellow Blvd., St. Louis, MO 63120-1798.
1-8.
LIST OF ABBREVIATIONS.
cm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. centimeter
FSN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Federal Stock Number
GPM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Gallons Per Minute
IN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . inch(es)
Lb . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . pound(s)
m . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . millimeter
MAX . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. maximum
NSN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . National Stock Number
PSI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Pounds Square Inch
WT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. Weight
1 2
|