| |
TM 10-4930-238-12&P
Appendix C
COMPONENTS OF END ITEM AND BASIC ISSUE ITEMS LIST
Section I. INTRODUCTION
C-1. SCOPE.
This appendix lists Components of End Item and Basic Issue Items for the Forward Area Refueling Equipment
to help you inventory items required for safe and efficient operation.
C-2. GENERAL.
The Components of End Item and Basic Issue Items List are divided into the following sections:
a.
Sect on II. Compo
i
nents of End Item. This listing is for informational purposes only, and is not authority to
requisition replacements. These items are part of the end item, but are removed separately packaged for
transportation or shipment. As part of the end item, these items must be with the end item whenever it is
issued or transferred between property accounts. Illustrations are furnished to assist you in identifying the
items.
b. Section III, Basic Issue Items. These are the minimum essential items required to place the Forward Area
Refueling Equipment in operation, to operate it, and to perform emergency repairs. Although shipped sepa-
rately packaged, Bll must be with the equipment during operation and whenever it is transferred between
property account. The illustrations will assist you with hard-to-identify items. This manual is your authority
to request/ requisition replacement BII, based on TOE/MTOE authorization of the end item.
C-3. EXPLANATION OF COLUMNS.
The following provides an explanation of columns found in the tabular listing:
a.
b.
c.
d.
Column (1) - Illustration Number (Illus. Number). This column indicates the number of the illustration in
which the item is shown.
Column (2) - National Stock Number. Indicates the national stock number assigned to the item and will be
used for requisitioning purposes.
Column (3) - Description. Indicates the Federal item and name and, if required, a minimum description to
identify and locate the item. The last line for each item indicates the CAGE (in parentheses) followed by
the part number.
Column (4) - Unit of Measure (U/M). Indicates the measure used in performing the actual operational/main-
tenance function. This measure is expressed by a two-character alphabetical abbreviation (e.g.,ea, in, pr).
C-1
|