Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Section III. TOOLS AND TEST EQUIPMENT REQUIREMENTS
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM  10-4930-229-12&P Section III. TOOLS AND TEST EQUIPMENT REQUIREMENTS FOR FORWARD AREA REFUELING EQUIPMENT Tool or test equipment Maintenance National  NATO PN ref  code category Nomenclature stock  number Tool  number (1) (2) (3) (4) (5) 1 O Tool  Set,  General  Mechanic’s 5180-00-177-7033 2 O Banding  Tool 5120-00-278-9925 3 O Multimeter, Digital 6625-01-145-2430 B C D Section IV. REMARKS Reference code Remarks A Refer to TM 10-4320 -256-14&P and TM 9-2805-257-14 for maintenance information on the pump and engine assembly. Refer  to  TM  5-4330-217-12&P  for  maintenance  information  on  the  filter/separator. Refer to TM 10-8110-201-14&P for maintenance information on the fabric drum. Refer  to  TM  5-4930  -226-12&P,  TM  5-4930-234-13&P  and  TM  5-4930-235-13&P  for maintenance  information  on  the  closed-circuit  refueling  nozzles. B-5/(B-6 blank)

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business