Section Ill. Operation Under Usual Conditions
2-4. PREPARATION FOR OPERATION
CAUTION
Filter/separator must be installed in the
unit will not properly filter fuel.
upright position only or
a. Installation. Place the filter/separator on a level site in an upright position.
WARNING
Failure to properly ground filter/separator prior to operation could
allow a static discharge (spark) which could ignite fuel or cause
an explosion of fuel vapor.
b. Grounding.
The ground rod must be driven into ground three to eight feet.
(1) Install the drive bolt (1) into a ground rod section (2) and drive the section into ground.
(2) Remove drive bolt (1) from section (2) and install it into another section (3). Screw section (3) into
section (2) and drive sections into ground.
(3) Remove drive bolt (1) from section (3) and install in top section (4). Screw section (4) into section (3)
and drive sections into ground.
(4) Insert ground wire (5) into clamp (6) and tighten thumbscrew (7).
NOTE
In the event that ground cannot be sufficiently penetrated, bury
ground rod in a horizontal trench not less than eight feel in length
and at least eight inches beneath the surface.
2-6
|