Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: ASSEMBLE ENGINE.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-4320-351-14 6.4  ASSEMBLE ENGINE. Follow  good  engineering  practice  during  engine  assembly.    Clean  and  inspect  all  parts  before  assembly.    Replace  any part  that  is  damaged  or  out  of  tolerance.    Use  assembly  lube  or  equivalent  on  all  mechanical  parts  to  prevent  damage during first start of reassembled engine.  Clean oil passages in block and all components before assembly. 6.4.1  Install Crankshaft. This task consists of: a.  Installation Refer to Figure 6-22. INITIAL SET-UP: Tools: Materials/Parts Required: Screwdriver, Flat blade Bearing (Appendix I, Item 12) (Appendix B, Section III, Item 3) Bearing (Appendix I, Item 13) Thickness Gauge, 0.006 (Appendix B, Section III, Item 3) Wrench, Torque, 0-300 in.  lb (Appendix B, Section III, Item 3) Extension, 6 in., 3/8 in.  drive (Appendix B, Section III, Item 3) Equipment Condition: Socket, Socket wrench, 6 mm Crankshaft removed (para.  6.3.18) (Appendix B, Section III, Item 3) Center Bearing Mounting Tool (Appendix B, Section III, Item 7) Bushing Extractor Tool (Appendix B, Section III, Item 6) Gloves, Welder (Appendix B, Section III, Item 3) a. Temporarily reassemble the two halves (1) of the center crankshaft bearing support.  Check for excessive wear of the  center  crankshaft  bearing  support  as  follows.    If  any  measurement  is  out  of  tolerance,  replace  the  bearing support. (1) Measurement A (Bearing Support Outer Diameter): 4.645-4.646 in.  (117.99-118.01 mm). (2) Measurement B (Bearing Support Inner Diameter): 1.888-1.889 in.  (47.965-47.985 mm). (3) Measurement C (Bearing Support Thickness): Not less than 1.06 in.  (27 mm). b. Measure diameter of crankshaft main journal, the two end journals and the two connecting rod journals.  Measure again at points that are 90° from first measurement.  Use the smaller of the two numbers for each measurement. Use  the  smaller  of  the  two  numbers  for  each  measurement.    Check  for  excessive  wear  in  accordance  with  the following.  If any measurement is out of tolerance, replace the crankshaft. (1) Measurement D (Main and End Journals): 1.772-1.769 in.  (45.01-44.93 mm). (2) Measurement E (Connecting Rod Journals): 1.575-1.572 in.  (40.005-39.925 mm). c. Install crankshaft bearing halves (2) in center bearing support halves (1). 6-36

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business