| |
TM 10-4320-348-14
2.6 INITIAL ADJUSTMENTS. DAILY CHECKS. AND SELF TESTS.
a.
Inspect pumping assembly for completeness, damage, and for proper operation as applicable. Report any
deficiencies to unit maintenance.
b.
Perform the "Before" preventive maintenance checks and services listed in Table 2-1.
2.7 OPERATING PROCEDURES.
a.
Starting. (Refer to Figure 2-6.)
CAUTION
The pump must be primed with fluid before starting.
(1)
Verify that preparation for use procedures listed in paragraph 2.5 and PMCS listed in Table 2-1 have been
performed.
(2)
Remove sound enclosure cover assembly (1).
(a)
Carefully squeeze release (2) and end of strap ratchet handle (3) together until tension on strap (4) is
released.
(b)
Rotate strap ratchet handle (3) upward to fully release ratchet assembly (5) locking device.
(c)
While keeping strap ratchet handle (3) in the upward position, pull entire ratchet assembly (5) away
from sound enclosure cover assembly (1) to totally disengage strap (4) from slot (6) of ratchet
assembly (5).
(3)
Check fuel cock (7) to down position.
Figure 2-6. Starting Procedures
(4)
Set fuel select valve handle (8) to UNIT TANK or auxiliary fuel.
(a)
If an auxiliary fuel tank is to be used as the fuel supply source, connect the supply hose to the AUX
FUEL fitting. Connect the other end of the supply hose to the auxiliary fuel tank.
2-21
|