| |
TM 10-4320-348-14
ALPHABETICAL INDEX
Subject, Page
Subject, Page
A
Columns, Explanation of
in Additional Authorization List, D-1
Abbreviations, Glossary, Glossary-1
in Components of End Item and Basic Issue Items
Abbreviations, List of, 1-3
Lists, C-1
Additional Authorization List
in Expendable Supplies and Materials List, E-1
Additional Authorization List
in Mandatory Replacement Parts, I-1
Explanation of Listing, D-1
Components of End Item and Basic Issue Items Lists
General , D-1
Explanation of Columns, C-1
Scope , D-1
General, C-1
Adjust, Valve Rocker Arm Assembly, 4-57
Control (CPC), Corrosion Prevention and, 1-1
Adjustments, Daily Checks, and Self Tests, Initial, 2-21
Cooling Case Cover, Air Intake Baffle, Flywheel, and,
Administrative Storage, 4-66
Replace/Inspect, 4-50
Air Filter Element, 3-8
Corrosion Prevention and Control (CPC), 1-1
Air Intake Baffle, Flywheel, and Cooling Case Cover,
Cross-Reference List, Nomenclature, 1-2
Replace/Inspect 4-50
Cylinder Head and Valve Assembly, Repair and
Air Intake Heater Repair and Replace , 4-40
Replace 6-2
Air Intake Heater Repair and Replace, 4-52
Arrestor, Spark, 4-54
Assembly and Preparation for Use, 2-17
D
Authorization List, Additional, D-1
Daily Checks, and Self Tests, Initial Adjustments, 2-21
B
Data, Equipment, 1-9
Decals and Instruction Plates, Operation Under Usual
Conditions, 2-24
Basic Issue Items, C-1 Conditions, 2-24
Decontamination Procedures, Nuclear, Biological, and
Biological, and Chemical (NBC) Decontamination
Chemical (NBC), 2-34
Procedures, 2-34
Definition of Unusual Terms, Glossary-2
Description and Use of, Scope, Operators Controls and
C
Indicators, 2-2
Description of Major Components, Location and, 1-4
Destruction of Army Materiel to Prevent Enemy Use,
Capabilities, and Features, Equipment Characteristics,
1-1
1-3
Diesel Engine Replacement, 5-11
Centrifugal Pump Assembly Repair and Replace, 5-4
Direct Support Maintenance Procedures, 5-3
Characteristics, Capabilities, and Features, Equipment,
Direct Support Troubleshooting, Scope, Direct Support
1-3
Troubleshooting Procedures, 5-2
Checks, and Self Tests, Initial Adjustments, Daily, 2-21
Direct Support Troubleshooting Table, 5-2
Chemical (NBC) Decontamination Procedures, Nuclear,
Discharge Hose Assembly Repair and Replace, 4-17
Biological and, 2-34
Drum Suction Stub Unloader Assembly Repair and
Replace, 4-18
Index - 1
|