| |
TM 10-4320-347-13&P
3.7. GROUND CABLE REPLACEMENT.
This task covers:
a.
Remove
b.
Replace
INITIAL SETUP:
Tools Required
None
Materials Required
None
Equipment Condition
Pump assembly shut down and cool.
a.
Removal (Refer to Figure 3-3). Remove ground cable assembly (1) from ground rod assembly (2)
and from pump assembly (3).
b.
Replace. Install ground cable assembly (1) onto pump assembly (3) and onto ground rod assembly
(2).
Figure 3-3. Ground Cable Replacement.
3-9/(3-10 Blank)
|