Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: SECTION Ill. OPERATOR MAINTENANCE PROCEDURES
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-4320-347-13&P SECTION Ill.  OPERATOR MAINTENANCE PROCEDURES 3.4.  GENERAL.  This section contains the maintenance procedures which the Maintenance Allocation Chart authorizes the operator to perform.  If the pump assembly still does not operate properly after performing these maintenance procedures, contact unit maintenance for assistance. 3.5.  HOSE ASSEMBLIES (SUCTION AND DISCHARGE) REPLACEMENT AND REPAIR. This task covers: a. Disassembly c. Assembly b. Repair INITIAL SETUP: Tools Required None Materials Required None Equipment Condition Pump assembly shut down and cool. Fuel drained from system. a. Disassembly.  (Refer to Figure 3-1). (1)   Remove hose assembly to be repaired from the pump assembly. (2)   Remove quick disconnect cap (1) and gasket (2) from coupling half (3). (3)   Remove quick disconnect plug (4) and gasket (5) from coupling half (6). b. Repair.  Repair of the hose assemblies is limited to the replacement of defective parts. c. Assembly. (1)   Install gasket (5) and quick disconnect plug (4) into coupling half (6). (2)   Install gasket (2) into cap (1) and install cap onto disconnect fitting (3). (3)   Install hose assembly onto pumping assembly. 3-6

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business