Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: SECTION II. SERVICE UPON RECEIPT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM   10-4320-343-14 SECTION  II.  SERVICE  UPON  RECEIPT 4.4  SERVICE UPON RECEIPT OF MATERIEL. 4.4.1       Checking Unpacked Equipment. a. Inspect   the   equipment   for   damage   incurred   during   shipment. If   the   equipment has   been   damaged,    report   the   damage   on   SF   361,   Report   of   Discrepancy. b. Check   the   equipment   against   the   packing   slip   to   see   if   the   shipment   is complete. Report   all   discrepancies   in   accordance   with   the   instructions   in DA   Pam   738-750. c . Check  to  see  whether  the  equipment  has  been  modified. 4.4.2     Processing Unpacked Equipment. Refer  to  DA  Form  2258,  Depreservation  Guide  for  Vehicles  and  Equipment,  packed  with the   equipment. The   depreservation   guide   explains   what   was   done   to   the   equipment prior   to   packaging. It  also  explains  what  has  to  be  done  before  placing  the equipment  in  operation. Perform   all   depreservation   actions   required   by   the depreservation    guide. 4.5 INSTALLATION INSTRUCTIONS. 4.5.1 t o o l 4.5.2 Tools,  Test  Equipment,  and  Materials  Required  for  Installation.  A  general  mechanic's kit   is   required   for   installation   of   the   equipment. Installation   Instructions.   Perform  the  following: Do   not   fill   battery   without   rubber   gloves   and   protective c l o t h i n g. Electrolyte   causes   serious   burns. Failure   to   obey this  warning  may  result  in  personal  injury  or  death. NOTE The   following   installation   procedure   must   be   made   with   the   assistance   of direct   support   level   maintenance   personnel. If   batteries   were   shipped   dry,   remove   and   fill   with   electrolyte   to   a level   3/8   inch   (9.5   mm)   above   cell   plates. Install   batteries,   attach   cables,    covers,   and   hold-down   bar   (paragraph 4 . 1 2 . 2 . Move   equipment   to   worksite   (paragraph   2.7.2). Refer   to   paragraph   2.3   for   preparation   for   use   of   350   GPM   pumping   assembly. a . b . c . d. 4.6  PUMP ASSEMBLY LUBRICATION. Refer to 10-4320-343-12 for lubrication instructions. 4-3

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business