Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Preparation for Movement at Worksite
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-4320-343-14 b. Disconnect suction hose (1, figure 2-9) from coupler half (2) and connect quick disconnect  plug  (3)  to  coupler  half (2). c. Disconnect discharge hose (4) from coupler half (5) and connect quick disconnect cap (6) to coupler half (5). d. Remove ground cable and store in tool box (7). e. Remove ground rod and store on frame (8). f. Remove quick release pins (1 and 2, figure 2-10) from tongue(3) and extend tongue extension to full length. g. Insert quick release pins (1 and 2) and secure tongue(3). h. Release pintle hook (4) and connect pumping assembly to towing vehicle (5). i. Attach and secure 350 GPM Pumping Assembly to towing vehicle (5). j. Remove pins (6 and 7) and push upward on trailer support legs (8) until holes align with mounting holes for pins (6 and 7). k. Reinstall pins (6 and 7) to secure trailer support legs (8) and remove chock (9) from wheel (10). CAUTION Do   not   tow   350   GPM   Pumping   Assembly   more   that   20   miles   per   hour   (mph). Failure to obey this caution could result in equipment damage. n.Tow 350 GPM Pumping Assembly to new location at worksite. 2.7.2    Preparation  for  Movement  to  New   Worksite.    Perform  the  following  to  move  350  GPM  Pumping  Assembly  to another worksite. a. If  operating,  perform  shutdown  procedures  in  paragraph  2.5.1.2  for  non-regulated  models  and  paragraph  2.5.2.2 for regulated models. b. Disconnect suction hose (1, figure 2-9) from coupler half (2) and connect quick disconnect plug (3) to coupler half (2). c. Disconnect discharge hose (4) from coupler half (5) and connect quick disconnect cap (6) to coupler half (5). d. Remove ground cable and store in tool box (7). e. Remove ground rod and store on frame (8). f. Attach lifting equipment to 350 GPM Pumping Assembly and lift: equipment on flatbed trailer. g. Secure the 350 CPM Pumping Assembly on trailer or vehicle. h. Transport 350 GPM Pumping Assembly to new worksite location. Change 1  2-31

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business