| |
TM 10-4320-343-14
NOTES
1.
INSTALLED TERMINALS, FIND 12-19, SHALL MEET THE PERFORMANCE
REQUIREMENTS OF MIL-T-7928.
2.
WIRING SHALL BE BUNDLED IN ACCORDANCE WITH REQUIREMENT 69 OF
MIL-STD-454 AND COVERED WITH TUBING, FIND NO. 20 AND 21.
3.
MARK "97403 - 13225E9054" IN ACCORDANCE WITH MIL-STD-130.
4.
EACH WIRE SHALL BE MARKED ON BOTH ENDS WITH APPROPRIATE WIRE
NUMBERS AS SHOWN IN TABULATION BLOCK.
EXAMPLE: TB - 1 Ö K3 - POS
PERMANENCY LEGIBILITY AND TYPE OF LETTERING SHALL BE IN
ACCORDANCE WITH MIL-STD-1 30.
Figure F-1.1. Pump Wiring Harness Assembly (Model 350 PAFN) (Sheet 1 of 2).
F-4 Change 1
|