| |
TM 10-4320-343-14
SECTION VI. PREPARATION FOR SHIPMENT AND STORAGE
4.18 PRESERVATION PROCEDURES.
No special preservation procedures are required for the 350 GPM pumping assembly.
4.19 PACKING.
No special packing procedures are requiered for the 350 GPM pumping assembly.
4.20 MARKING.
Refer to MIL-STD-129 for information on marking.
4.21
a .
b .
c .
d .
STORAGE.
Store equipment so as to provide maximum protection from the elements and to
provide access for inspection, maintenance, and servicing.
Take into account environmental conditions, such as extreme cold or heat, high
humidity, blowing snow, earthquakes, or combinations thereof, and take
adequate precautions.
Placement of equipment in administrative storage should be for short periods
of time when a shortage of maintenance effort exists.
Items should be in
mission readiness within 24 hours or within the time factors as determined by
the directing authority.
During the storage period appropriate maintenance
records will be kept.
Before placing equipment in administrative storage, current preventive
maintenance checks and services should be completed, shortcomings and
deficiencies should be corrected, and all modification work orders (MWOs)
should be applied.
4-137/(4-138 blank)
|