| |
TM 10-4320-342-24
3-34.
WINCH CONTROL CABLE ASSEMBLIES REPAIR - continued.
c. INSTALLATION. Refer to Figure 3-57.
(1)
Slide seal nut (25), seal ring (29) and seal (28) on cable (26).
(2)
Push electrical leads (11 and 12) through adapter (27) on junction box (8).
NOTE
Wire numbers are stamped on each wire lead. This information, in conjunction
with data on FO-1 and FO-2, 200/600 GPM Pump Wiring Diagram, may be used to
connect wire leads if tags are lost or illegible.
(3)
Install electrical leads (11 and 12) on solenoid valves (17 and 18) and secure with lockwashers (16) and nuts (15).
(4)
Install seal (28), seal ring (29) and seal nut (25) on adapter (27).
(5)
Seal seal nut (20), seal ring (24) and seal (23) on cable (21).
(6)
Push electrical leads (9 and 10) through adapter (22) on junction box (8).
(7)
Install electrical lead (10) on solenoid valve (17) and secure with lockwasher (16) and nut (15).
(8)
Install electrical lead 99) on terminal board (14) and secure with screw (13).
(9)
Install seal (23), seal ring (24) and seal nut (20) on adapter (22).
(10)
Remove tags from electrical leads (9, 10, 11 and 12).
(11)
Position cover (7) on junction box (2) and secure with screws (6).
(12)
Install electrical connectors (2 and 3) on receptacles (4 and 5),
(13)
Close door panel (1).
3-122
|