| |
TM 10-4320-342-24
3-30.
CONTROL BOX WIRING HARNESS REPAIR - continued.
c. INSTALLATION. Refer to Figure 3-52.
NOTE
Wire numbers are stamped on each wire lead. This information, in conjunction
with data on FO-1 and FO-2, 200/600 GPM Pump Wiring Diagram, may be used to
connect wire leads if tags are lost or illegible.
(1)
Position wiring harness (53) in control box (54).
(2)
Connect electrical connectors (45, 46, 47 and 48) to electrical connectors (49, 50, 51 and 52).
(3)
Install relay sockets (40, 41, 42, 43 and 44) in mounting bracket (34).
(4)
Install self-locking nuts (38) and flat washers (39) on studs (33) to secure relay sockets (40, 41, 42, 43 and 44) in
mounting bracket (34).
(5)
Connect wiring to back of relay sockets (40, 41, 42, 43 and 44).
(6)
Position mounting bracket (34) in control box (54) and secure with screws (37), flat washers (36) and nuts (35).
(7)
Install relays (28, 29, 30, 31 and 32) on studs (33) and secure with flat washers (27) and self-locking nuts (26).
(8)
Install wire leads (24) and screws (23) on terminal boards (25).
(9)
Install wire leads (21), fuse link (20),'flat washers (19) and locknuts (18) on fuse holder (22).
(10)
Install wire leads (17), lockwashers (16) and screws (15) on R4 shunt (14).
(11)
Install wire leads (13), flat washers (12) and nuts (11) on R4 shunt (14).
(12)
Install wire leads (9), flat washers (8) and locknuts (7) on K2 and K6 relays (10).
(13)
Install wire leads (5), lockwashers (4) and nuts (3) on K3 relay (6).
(14)
Connect electrical connector (1) to voltage regulator (2).
3-111
|