Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: STUD TERMINAL (GROUND) REPLACEMENT.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-4320-342-24 2-89. STUD TERMINAL (GROUND) REPLACEMENT. This Task Covers a.  Removal b.  Service c.  Installation INITIAL SETUP Tools Equipment Condition General Mechanics Tool Kit (App B, Sect III, Ground Wire disconnected (System TM) Item 1) 200/600 GPM Pump shut down (Para 2-7c, TM 10-4320-342-10) Materials/Parts Lockwasher (App F, Item 64) Self-locking Nut (App F, Item 106) a.  REMOVAL.  Refer to Figure 2-119. (1) Open door (1). (2) Remove self-locking nut (2), lockwasher (3), wiring (4) and lockwasher (5) from ground terminal (6). (3) Remove ground terminal (6) from 200/600 GPM (7). b.  INSTALLATION. WARNING Improper   grounding   (bonding)   connections   between   wiring,   frame   and   ground terminal can generate a static discharge (spark).  Make sure connections provide a metal-to-metal   contact   between   wiring,   frame   and   ground   terminal.      A   static discharge   could   ignite   fuel   or   cause   an   explosion   of   fuel   vapor   and   cause personnel injury or death. (1) Install ground terminal (6) on 200/600 GPM pump (7). (2) Install lockwasher (5), wiring (4), lockwasher (3) and self-locking nut (2) on ground terminal (6). (3) Close door (1). 2-268

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business