| |
TM 10-4320-342-24
2-84. TERMINAL BOARD (TB-S) REPLACEMENT.
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Tools
Equipment Condition
General Mechanics Tool Kit (App B, Sect III,
Battery disconnected (Para 2-62)
Item 1)
Materials/Parts
Tags (App E, Item 16)
Self-locking Nut (App F, Item 62)
a.
REMOVAL. Refer to Figure 2-114.
(1) Remove panel (1) from 200/600 GPM pump (2).
(2) Tag electrical wiring (3).
NOTE
Note location of buss connectors prior to removal.
(3) Remove screws (4), flatwashers (5) and electrical wiring (3) from terminal board (6).
(4) Remove self-locking nuts (7), flatwashers (8), screws (9) and terminal board (6).
b.
INSTALLATION.
(1) Position terminal board (6) on 200/600 GPM pump and secure with self-locking nuts (7), flatwashers (8) and
screws (9).
NOTE
Wire numbers are stamped on each electrical wire. This information, in
conjunction with data on FO-1 and FO-2, 200/600 GPM Pump Wiring Diagram, may
be used to connect wires if tags are lost or illegible.
(2) Position electrical wiring (3) on terminal board (6) as tagged during removal. Secure electrical wiring (3) with
screws (4) and flatwashers (5).
(3) Install panel (1) on 200/600 GPM Pump (2).
2-259
|