TM 10-4320-342-24
2-79. RELAYS (K1, K4, K5, K7 and K11) REPLACEMENT (TYPICAL).
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Tools
Tools
General Mechanics Tool Kit (App B,
200/600 GPM Pump shutdown
Sect III, Item 1)
(Para 2-7c, TM 10-4320-342-10)
NOTE
This procedure covers the replacement of relay K1. Replacement of K4, KS, K7
and K11 relays are identical to K4 relay.
a.
REMOVAL. Refer to Figure 2-106.
(1) Open and lock control panel door (1) in place with door latch (2).
(2) Open control panel (3).
(3) Remove nut (4) and washer (5) from stud (6).
(4) Remove relay (7) from plug (8).
b.
INSTALLATION.
(1) Install relay (7) in plug (8).
(2) Install washer (5) and nut (4) on stud (6).
(3) Close control panel (3).
(4) Unlatch door latch (2) and close control panel (1).
2-246
|