TM 10-4320-342-24
2-77. TERMINAL BOARD REPLACEMENT (TYPICAL).
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Tools
Equipment Condition
General Mechanics Tool Kit (App B, Sect III,
200/600 GPM Pump shut down (Para 2-7c,
Item 1)
TM 10-4320-320-10)
Materials/Parts
Tags (App E, Item 16)
Locknuts (App F, Item 63)
a.
REMOVAL. Refer to Figure 2-104.
(1) Open cover (1) and lock in place.
(2) Open control panel (2).
(3) Tag electrical wiring (3).
(4) Remove screws (4) and electrical wiring (3) from terminal board (5).
NOTE
Note location of buss connectors prior to removal.
(5) Remove screw (4) and buss connector (6) from terminal board (5).
(6) Remove locknuts (7), flatwashers (8), screws (9) and terminal board (5) from control box (10).
b.
INSTALLATION.
(1) Position terminal board (5) in bottom of control box (10) and install screws (9), flatwashers (8) and locknuts (7).
NOTE
Wire numbers are stamped on each electrical wire. This information, in
conjunction with data on FO-1 and FO-2, 200/600 GPM Pump Wiring Diagram, may
be used to connect wires if tags are lost or illegible.
(2) Connect electrical wiring (3) on terminal board (5) and secure with screws (4).
(3) Install buss connector (6) with screw (4) on terminal board (5).
(4) Close control panel (2).
2-242
|