| |
TM 10-4320-342-24
2-76. FUSE LINK AND HOLDER REPLACEMENT.
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Tools
Equipment Condition
General Mechanics Tool Kit (App B, Sect III,
200/600 GPM Pump shut down (Para 2-7c,
Item 1)
TM 10-4320-320-10)
Materials/Parts
Tags (App E, Item 16)
Locknut (App F, Item 63)
a.
REMOVAL. Refer to Figure 2-103.
(1) Open and lock in place cover (1).
(2) Open control panel (2).
(3) Tag electrical wiring (3).
(4) Remove locknut (4), flatwashers (5) and fuse link (6) from fuse holder (7).
(5) Remove wiring (3) from fuse holder (7).
(6) Remove locknuts (8), flatwashers (9), screws (10) and fuse holder (7) from control box (11).
b.
INSTALLATION.
(1) Install fuse holder (7) in control box (11) and secure with screws (10), flatwashers (9) and locknuts (8).
NOTE
Wire numbers are stamped on each electrical wire. This information, in
conjunction with data on FO-1 and FO-2, 200/600 GPM Pump Wiring Diagram, may
be used to connect wires if tags are lost or illegible.
(2) Install wiring (3) on fuse holder (7).
(3) Install wiring (3) and fuse link (6) on fuse holder (7) and secure with flatwashers (5) and locknuts (4).
(4) Close control panel (2) and cover (1).
2-240
|