| |
TM 10-4320-342-24
2-64. BATTERY TRAY REPAIR.
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Tools
Equipment Condition
General Mechanics Tool Kit (App B, Sect III,
Battery Heater removed (Para 2-63)
Item 2)
Battery Cover removed (Para 2-28)
Tool Kit, Blind Rivet (App B, Sect III, Item 2)
Drill (App B, Sect III, Item 2)
Twist Drill Set (App B, Sect III, Item 2)
Material/Parts
Adhesive (App E, Item 3)
Grommet (App E, Item 28)
Foam (App E, Item 26)
Lockwasher (App E, Item 105)
a. REMOVAL. Refer to Figure 2-91, Sheet 1 of 2.
(1)
Remove pin (1) from 200/600 GPM Pump (2) and battery tray (3).
(2)
Remove battery tray (3) from 200/600 GPM Pump (2).
(3)
Remove bushings (4) from 200/600 GPM Pump (2) and battery tray (3).
b. DISASSEMBLE.
(1)
Remove bolts (5), lockwashers (6), flatwashers (7) and pin block (8) from battery tray (3).
(2)
Remove nut (9), flatwashers (10 and 11), lock plate (12), spacer (13), flatwashers (14 and 15), spring (16),
bushing (17), flatwasher (18) and bolt (19) from battery tray (3).
(3)
Remove wing nut (20), flatwasher (21) and nut (22) from rod (23).
(4)
Remove cotter pin (24), flatwasher (25) and rod (23) from battery tray (3).
(5)
Remove nuts (26), flatwashers (27 and 28), screws (29) and bracket (30) from battery tray (3).
(6)
Remove foams (31 and 32) and grommet (33) from battery tray (3).
(7)
Drill out rivnut (34) from battery tray (3).
Refer to Figure 2-91, Sheet 2 of 2.
(8)
Remove insulations (1, 2, 3 and 4).
(9)
Remove screw (5), lockwasher (6), flatwasher (7), lock plate (8) and spacers (9 and 10).
2-214
|