Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: TOTAL TIME METER REPLACEMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-4320-342-24 2-58.  TOTAL TIME METER REPLACEMENT. This task covers: a.  Removal b.  Installation INITIAL SETUP Tools Equipment Condition General Mechanics Tool Kit (App B, Sect III, 200/600 GPM  pump assembly shut down Item 1) (Para 2-7c, TM 10-4320-342-10) Torque Wrench: 0-300 inch-pounds (App B, Sect III, Item 2) Material/Parts Textile Braid (App E, Item 19) Tag (App E, Item 16) Insulation Sleeving (App E, Item 31) a.  REMOVAL.  Refer to Figure 2-85. (1) Open door (1). (2) Remove textile braids (2) and slide sleeving (3) off connectors (4 and 5). (3) Tag and disconnect connectors (4 and 5). (4) Remove bolts (6), washers (7) and total time meter (8). b.  INSTALLATION. (1) Position total time meter (8) on engine and install washers (7) and bolts (6).  Torque 40 inch-pounds. NOTE Wire    numbers    are    stamped    on    each    electrical    wire.        This    information,    in conjunction with data on FO- 1 and FO-2, 200/600 GPM Pump Wiring Diagram, may be used to connect wires if tags are lost or illegible. (2) Connect connectors (4 and 5). (3) Slide sleeving (3) over connectors (4 and 5) and tie textile braids (2) on sleeving. (4) Close door (1). 2-201

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business