Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: BLEED AIR CHECK VALVE REPLACEMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-4320-342-24 2-35.  BLEED AIR CHECK VALVE REPLACEMENT. This task covers: a.  Removal b.  Installation INITIAL SETUP Tools Equipment Condition General Mechanics Tool Kit (App B, Sect III, 200/600 GPM  pump assembly removed from Item 1) system  (Para 2-9, TM 10-4320-342-10) Material/Parts Antiseize Tape (App E, Item 6) a. REMOVAL.  Refer to Figure 2-56. (1) Open door (1). (2) Disconnect tubes (2 and 3) and remove valve (4). (3) Remove reducer (5) from valve (4). b. INSTALLATION. NOTE Install  antiseizing  tape  (teflon  tape)  on  all  male  pipe  threads  and  wrap  tape  in direction of threads.  Do not allow teflon tape to extend beyond end of threads. (1) Install reducer (5) on inlet side of valve (4). NOTE Insure flow arrow on valve points up. (2) Install tubes (2 and 3) on valve (4) and reducer (5). (3) Close door (1). 2-142

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business