| |
TM 10-4320-342-24
2-21. BALL VALVE AND DISCHARGE ADAPTER REPLACEMENT - continued
(2)
Align marks and position discharge adapter (4) with ball valve (10) and pump clutch assembly (12).
(3)
Install bolts (9), flatwashers (8) and locknuts (7). Torque 170 to 187 foot-pounds.
(4)
Lubricate and position preformed packing (6) on plug (5) and install into discharge adapter (4).
(5)
Lubricate and position preformed packing (3) onto adapter (2) and install into discharge adapter.
(6)
Install swivel elbow (1) on adapter (2).
Figure 2-41. Ball Valve and Discharge Adapter Replacement
2-112
|