| |
TM 10-4320-324-14
2-8. Preparation for Movement.
a.
Perform shutdown procedure on pumping assembly (para 2-7c).
b.
Ensure fuel selector valves (11) are in the off position.
c.
Disconnect grounding cable (9) and stow cable and attaching hardware in tool box. Stow ground rod (8) on frame
assembly. This is not required for Model 13229E8401 (97403).
d.
Attach pumping assembly to towing vehicle (5) using pintle (4).
e.
Stow trailer support legs (3) in frame using pins (1 and 2).
f.
Remove chocks (6) from under wheels (7) and stow.
Section IV. OPERATION UNDER UNUSUAL CONDITIONS
2-9. Nuclear, Biological, and Chemical (NBC) Decontamination.
a.
If attack is known or suspected, mask at once and continue mission. If inside, stay there if possible.
b.
If outside, brush fallout from skin, clothing, and equipment with available brushes and rags before going inside.
Wash skin and have a radiation check made as soon as tactical situation permits.
c.
Do not unmask until told to do so.
d.
Detailed DECON procedures can be found in FM 3-3, FM 3-4, and FM 3-5.
2-19
|