Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Preparation for Movement.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-4320-324-14 2-8.  Preparation for Movement. a. Perform shutdown procedure on pumping assembly (para 2-7c). b. Ensure fuel selector valves (11) are in the off position. c. Disconnect grounding cable (9) and stow cable and attaching hardware in tool box.  Stow ground rod (8) on frame assembly.  This is not required for Model 13229E8401 (97403). d. Attach pumping assembly to towing vehicle (5) using pintle (4). e. Stow trailer support legs (3) in frame using pins (1 and 2). f. Remove chocks (6) from under wheels (7) and stow. Section IV.  OPERATION UNDER UNUSUAL CONDITIONS 2-9.  Nuclear, Biological, and Chemical (NBC) Decontamination. a. If attack is known or suspected, mask at once and continue mission.  If inside, stay there if possible. b. If  outside,  brush  fallout  from  skin,  clothing,  and  equipment  with  available  brushes  and  rags  before  going  inside. Wash skin and have a radiation check made as soon as tactical situation permits. c. Do not unmask until told to do so. d. Detailed DECON procedures can be found in FM 3-3, FM 3-4, and FM 3-5. 2-19

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business