| |
TM10-4320-324-14
5-17. Engine Assembly Replacement
This task covers:
a.
Removal
b.
Cleaning/Inspection
c.
Installation
d.
Follow-on Maintenance
INITIAL SETUP:
Tools
Equipment Condition
Tool kit, general mechanics, item 35, section III,
Lower side panels removed (para 4-24).
appendix B
Tool box removed (para 4-61).
Lifting device (300 lb capacity)
Engine wiring harness disconnected (para 4-
38).
Lifting eyes (2)
Engine fuel lines disconnected (para 4-41).
Materials/Parts
Lockwashers (12) - 21171-511
Self-locking nuts (6) - MS21044 N10
Personnel Required
Two
5-49
|