| |
TM 10-4320-324-14
5-13. Injection Pump Testing (CONT).
(14)
Remove test gauge (3) and install three lines (2).
(15)
Refer to paragraph 4-45 and bleed injection lines and tighten fittings on three lines (2).
(16)
Return injection pump lever (1) to shutdown position.
b. Follow-on Maintenance.
(1)
Install rocker cover (para 5-22).
(2)
Install v-belt guard (para 4-31).
(3)
Install roof panels (para 4-13).
END OF TASK
5-28
|