Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Testing
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-4320-324-14 b. Testing. (1) Perform starter solenoid ammeter test. (a) Connect   positive   battery   cable   to   one   side   of   the ammeter   and   the   negative   battery   cable   to   solenoid ground. WARNING Ensure   switch   is   open   prior   to   connecting   to   starter solenoid.        Electrical    shock    may    result    solenoid    is energized while making final battery connection. (b) Connect  switch  leads  to  ammeter  and  solenoid  switch terminal (S). (c) Connect    voltmeter    leads    to    solenoid    ground    and solenoid switch terminal (S). (d) Connect    carbon    pile    across    positive    and    negative battery terminals. (e) Close   switch   and   adjust   carbon   pile   until   voltmeter indicates 11 VDC. (f) Observe  ammeter  reading.    If  reading  is  below  or  above  120  to  210  amps,  replace  starter  solenoid.    If solenoid is good, install new starter assembly per paragraph 4-36. c. Assembly. (1) Attach starter solenoid (4) with three screws (3). (2) Install clamp (2) and screw (1). d.  Follow-on Maintenance. Install starter assembly (para 4-36). END OF TASK 5-17

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business