Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Testing.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-4320-324-14 4-37.  V-Belt Contact Switch Replacement (CONT). b. Testing. (1)   Connect one lead of electrical circuit tester to terminal of switch and other lead to body of switch. (2)   Check for continuity with switch in operated and nonoperated condition. (3)   If switch registers continuity or an open circuit in both conditions, switch is defective and must be replaced. (4)   Connect lead of tester to other terminal of switch.  Repeat steps (2) and (3) to test remaining circuit of switch. b. Installation. (1)   Install switch (3) and nut (2). NOTE Wires must connect to DIRECT OPPOSITE terminals of v-belt contact switch. (2)   Connect wires (1) to switch (3). c. Follow-on Maintenance.  Install v-belt guard (para 4-31). END OF TASK 4-112

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business