Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Operating Procedures.
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-4320-311-14 g. Remove dust cap (11) from discharge hose assembly adapter and remove plug (12) from the nozzle assembly coupler.    Connect  discharge  hose  assembly  adapter  to  nozzle  assembly  coupler  or  make  connections  to  other pump accessories as required by desired application.  If required, remove cap from nozzle assembly. NOTE Use Y-connectors and hoses as needed for multiple nozzle assembly connections. h. Make sure that all connections are tight, perform operator PMCS. 2-6.  Operating Procedures. a. Starting.  Refer to Figure 2-4. CAUTION The volute must be filled with fluid before starting. (1)   Verify that Preparation For Use procedures listed in paragraph 2-5 and PMCS listed in paragraph 2-3 have been performed. (2)   Open access door (1). (3)   Set fuel cock (2) to open position by turning handle to the downward position. Figure 2-4.  Starting Procedures 2-19

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business