| |
TM 10-4320-258-14&P
4-8. Dismantling for Movement.
.
.
.
(1) Disconnect the suction and discharge hoses from the pump assembly.
(2) Install the dust plug on the suction female coupling and the dust capon the discharge male coupling of
the pump.
(3) Disconnect the ground cable from the grounding rod and remove the rod.
b. Securing for Movement
W A R N I N G
Weight of the pump exceeds one person lift limit. Maximum height of lift for two persons
is 2.8 feet (85.3 centimeters).
(1) Place the pump assembly on the carrier bed.
(2) Secure the equipment to the carrier bed and transport to the new worksite.
Section Ill. UNIT PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
Paragraph
Page
4-9
General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 4-3
4-10
PMCS Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ...4-3
4-9. General. Unit level PMCS are done to ensure that the pump assembly is in top operating condition. A
comprehensive PMCS program reduces equipment downtime and increases the operational readiness of the
pump assembly.
4-10. PMCS Procedures. Unit level PMCS is contained in table 4-1. The numbers in the Item NO. column
show the order in which the check or service should be done. These numbers should be used when recording
deficiencies and short comings on DA Form 2404, Equipment Inspection and Maintenance Worksheet. The dot (.)
in the Interval column indicates when the check or service should be done.
4-3
|