| |
TM 10-3835-231-13
Section III. DIRECT SUPPORT MAINTENANCE PROCEDURES
The procedures in this section have been arranged in the order in which the items appear in the direct support (F)
maintenance level column on the Maintenance Allocation Chart (MAC) which is provided in Appendix B. Step-by-step
procedures have been provided for all actions authorized to be performed by direct support maintenance in the order in
which they appear on the MAC.
5-4. HOSE REPAIR (HOSES WITH BAND TYPE CLAMPS).
This task covers:
a. Disassembly
b. Repair
c. Assembly
INITIAL SETUP
Tools
Material/Parts
Tool Kit, General Mechanics (Appendix B, Section III,
Petrolatum (Appendix E, Item 5).
Item 1).
Band-It Type Clamps Sizes 1 Inch (Appendix I, Item 1).
Sealer, Steel Strap (TM 10-3835-231-23P, Fig 21,
Band-It Type Clamps Sizes 1 1/2 Inch (Appendix I,
Item 1).
Item 2).
Adapter Banding (TM 10-3835-231-23P, Fig 21, Item 2).
Band-It Type Clamps Sizes 4 Inch (Appendix I, Item 3).
Equipment Condition
Hose assembly removed. (See para 4-37.)
NOTE
Disassemble only to extent necessary for repair.
a.
Disassembly.
(1)
Release cam arms and pull plug (1) and cap (2) away from couplings (3) and (4).
Figure 5-1. Banded Hose Assemblies
5-2
|