Page Title: RANGE POLE INSTALLTION
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-3835-231-13 CAUTION INTERNAL CLANLINESS Make sure all hoselines, fittings and valves are clean internally.  Foreign materials may disrupt operations and damage equipment. NOTE Liberally   apply   petroleum   to   the   gasgest   and   the   inside   surfacres   of   coupling gasket   over   one   prevent   pinching   during   installation.      Then,   pull   the   coupling gasket  over  one  grooved  end  of  each  mating  joint.    Ensure  gasket  is  properly positioned  over  full  circumference  of  sealing  surfaces.    Position  coupling  clamp over   gasket.      While   mainting   alignment   of   mating   parts,   lock   coupling   clamp securely. f. Align mating surfaces of gate valves (4), tees (5), and coupling clamps (3) and assembles valve tee combinations as shown. g. Connect 2 inch Cam-lock adapter (6) to tank (1) elbows. h. Connect 6 inch x 50-foot hose assemblies (7) between adapters (6) and valves (4)  using coupling clamps (3). i. Check that gasket (8) are in place and connect 2 each female coupling adapters (9) to tank (1) valves. j. Connect  6  inch  x  12-foot  hose  assemblies  (10)  between  female  coupling  adpters  (9)  and  valves  (4)  and  tee  (5) and pump (2) using coupling clamps (3). k. Connect 6 inch x 50-foot hose assembly (7) to outlet side of pump (2) using clamp (3). l. Connect gate valve (4) and 6 inch x 50-ft hose assembly (7) to end of above hose using coupling clamp (3). m. Place 4 teach  range  poles  (11),  nylon  cord  (12),  1  each  drop  pan  (13),  absorbent  oil  material  (14)  and  storage drum (15) where they will be available for use if needed. 4-10. RANGE POLE INSTALLTION. Install range poles and cords accross all 5000 bbl tanks. (see figure 4-9). a. A  range  pole  consists  of  two  sections  of  steel  tubing.    The  assembled  length  is  6-1/2  feet,  including  a  hardened steel point permanently fastened to the lower end.  A spring catch locks the two sections together. b. The  range  poles  are  used  to  roughly  gauge  and  estimate  the  fuel  quantity  in  the  fabric  collapsible  tanks  in  the TPT.  Two poles are supplied for each 5,000 bbl tank.  They are set in the berms on opposite sides of the tank and a cord is stretched across the thank.  The level of the cord can be set as bets suits the operator, however, it is recommended the level be set at the full height of the thank, i.e., 6 feet 8 inches from the pad. c. It is recommended that a ball or other object be mounted on the cord at the center of the thank.  Stakes and guy lines may be added to eliminate sag in cord. 4-25