| |
TM 10-3835-231-13
CHAPTER 4
UNIT MAINTENANCE INSTRUCTIONS
Section I. LUBRICATION INSTRUCTIONS
Lubrication instructions are in Appendix F of this TM. All lubrication instructions are mandatory.
Section II. REPAIR PARTS, TOOLS, SPECIAL TOOLS, TEST,
MEASUREMENT AND DIAGNOSTIC EQUIPMENT (TMDE), AND SUPPORT
EQUIPMENT
Repair parts are listed and illustrated in the Repair Parts and Special Tools List TM 10-3835-231-23P. Mandatory
replacement parts are listed in Appendix I, Mandatory Replacement Parts List.
Tools and test equipment requirements are listed in Appendix B, Maintenance Allocation Chart. For authorized common
tools and equipment, refer to the Modified Table of Organization and Equipment (MTOE), CTA 50-970 as applicable to
your unit.
No special tools, test, measurement and diagnostic equipment, or support equipment is required for maintenance of this
equipment.
Section III. SERVICE UPON RECEIPT
4-1. UNLOADING.
Various components of the TPT are packaged in containers designed for reuse. Care should be-taken to avoid container
damage.
(1) Remove all blocking and tiedowns that may have been used to secure the container to the carrier.
WARNING
Do not allow items to swing while suspended from a lifting device. Failure to
observe warning may result in injury to personnel and damage to equipment.
CAUTION
Use care in handling equipment to avoid damage. If an overhead lifting device
must be used, use an appropriate sling so that the weight of the item is borne by
the base of the shipping container.
(2) Use a forklift truck or other suitable material handling equipment to remove the packaged items from the
carriers.
4-1
|