Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Figure 2-8. Installing Hoseline On Towers (Sheet 2 of 2).
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM     10-3835-219-14 (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) N  O  T E Second   shackle   must   be   installed   to   afford   attachment   of   turnbuckle. Attach   a   second   shackle   (11)   to   first   shackle   (9).   Install   shackle   bolt   (12). Unscrew   turnbuckle   (13)   so   that   it   is   nearly   fully   extended.   This   will   allow   for   turnbuckle   adjustment   to take-up   wire   rope   (14)   sag. Attach   turnbuckle   (13)   to   shackle   (11)   and   wire   rope   (14). Attach   opposite   end   of   wire   rope   (14)   exactly   as   in   steps   (4)   through   (11)   above. Use   turnbuckles   to   adjust   sag   with   no   load   on   wire   rope   to   6   percent   of   span.   Refer   to   Table   2-3. Place   shackle   (15)   on   wire   rope   (14). Lift   hose   end. Wrap   saddle   (16)   around   hose   (17)   and   attach   to   shackle   (15)   with   bolt   (18)   and   nut   (19). Tie   manila   rope   (19)   to   leading   end   of   hose   (17). As   saddles   (16)   are   applied   and   secured,   use   manila   rope   (19)   to   pull   hoseline   across   stream,   gorge   or obstruction.   Saddles   will   travel   along   wire   rope,   providing   support   for   hose. When   hose   line   is   in   place,   use   clamps   (20)   to   secure   shackles   (15)   closes   to   guy   stake   to   wire   rope   to prevent   an   accumulation   of   slack   in   center   of   span. Gate   valves   should   be   installed   at   hose   coupling   nearest   each   side   of   span. After   line   is   filled   with   fuel,   readjust   sag   to   maximum   of   9   percent   of   span.   Refer   to   Table   2-4. Figure   2-8.   Installing   Hoseline   On   Towers   (Sheet   2   of   2). 2 - 2 8

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business